§ 12-96. Authority to proceed with installation of improvements.  


Latest version.
  • (a)

    Receipt by the subdivider of the approval of the preliminary plat by the planning commission shall constitute authority for the subdivider to proceed with the installation of the following minimum improvements and preparation of the final plat. The subdivider shall:

    (1)

    Submit final construction plans and specifications to the engineer prior to construction of any of the required improvements, or the submission of a performance bond.

    (2)

    Submit engineering maps showing approximate grades and profiles of streets and plans regarding facilities for stormwater drainage, and other proposed improvements such as sidewalks, plantings, parks and any grading of individual lots except when specifically not required by the planning commission.

    (b)

    If the engineer shall find such plans and specifications to be in accordance with applicable policies and standards of the governing authority, he shall authorize construction and determine the amount of bond, if required. Following the approval of the plans and specifications, construction may be started or the bond may be filed.

    (c)

    All improvements must be inspected during the course of construction of the improvements. A schedule of inspections must be coordinated with the engineer. The engineer will make written inspection reports during the period of construction.

    (d)

    Prior to the commencement of any development all construction plans specifications must meet with the city engineer's approval.

    (e)

    Prior to the commencement of any development, the city engineer must receive a copy of the approved "erosion, sediment, and storm water control plan" from the Mississippi Department of Environmental Quality and Pollution Control.

(Ord. No. 29, art. VI(A), 4-5-83; Ord. of. 12-8-95(2), § IX)